Abandoned NP Process and Evidence
The Neighbourhood Plan review started in 2018 but was abandoned after a Regulation 14 Consultation in 2021 due to delays with the Chichester Local Plan review. The village was subsequently allocated further housing.
A considerable amount of work and consultation was undertaken and much of this earlier work is incorporated into the Revised draft Neighbourhood Plan which is on Regulation 14 Consultation from 9th November to 22nd December 2026. The previous consultation and evidence is documented below and can be viewed on this website.
- October 2018: Housing Needs Survey undertaken by CDC.
- November 2018: NP Review Group established.
- January to March 2019: Call for Sites undertaken.
- March 2019: Report by independent planning consultant who reviewed the proposed site assessment methodology and criteria.
- From April 2019: Site assessments undertaken by the NP Review Group.
- June 2019: AECOM, an independent planning consultancy obtained through Locality, a government backed organisation, provided site assessment technical support. AECOM undertook site assessments to provide further evidence and validate the NP Review Group’s work.
- August 2019: AECOM provided advice and support in relation to the Evidence Base and Policy development.
- September 2019: A community consultation was held which gave explanation to the Neighbourhood Plan review process and sought community feedback on sites submitted.
- Autumn 2019: The NP Review Group undertook local assessments of all 5 Local Green Gaps.
- November 2019: The consultancy, used by CDC to undertake the District’s Landscape Capacity Study, Terra Firma Consultancy Ltd, was engaged to undertake a locally valued open land assessment in support of the local assessments.
- January 2020: Community survey distributed to all households.
- March 2020: Independent highways advice obtained.
- March 2020: AECOM offered a bespoke support package to review the Local Green Gap Assessments and process. This resulted in further work being undertaken by the NP Review Group.
- September 2020: Local residents were invited to undertake an independent validation of the Local Green Gap Assessment process. The NP Review Group subsequently held a standardisation meeting before submitting the final report to AECOM for validation.
- November 2020: AECOM reviewed the final Local Green Gap Report and concluded the re-assessment was suitably robust.
- Late November 2020: CDC confirmed the housing allocation for Wisborough Green had increased to 40 dwellings.
- January 2021: Site Consultation Survey.
- January 2021: AECOM engaged to undertake Strategic Environmental Assessment & Habitat Regulations Assessment.
- February 2021: Analysis of the Site Consultation results and all supporting evidence to inform the Site Selection Report.
- May 2021: Regulation 14 Consultation – the process was subsequently abandoned due to delays with the Chichester Local Plan review.